Revoked by MEPC.351(78)
RESOLUTION MEPC.334(76)
(adopted on 17 June 2021)
2021
GUIDELINES ON SURVEY AND CERTIFICATION OF THE ATTAINED ENERGY EFFICIENCY
EXISTING SHIP INDEX (EEXI)
THE MARINE ENVIRONMENT PROTECTION COMMITTEE,
RECALLING Article 38(a) of the Convention on the International
Maritime Organization concerning the functions of the Marine Environment
Protection Committee conferred upon it by international conventions for the
prevention and control of marine pollution from ships,
NOTING that it adopted, by resolution MEPC.328(76), the 2021 revised MARPOL Annex
VI, which is expected to enter into force on 1 November 2022 upon its deemed
acceptance on 1 May 2022,
NOTING IN PARTICULAR that the 2021 revised MARPOL Annex VI
contains amendments concerning mandatory goal-based technical and operational
measures to reduce carbon intensity of international shipping,
NOTING FURTHER that regulation 5 (Surveys) of MARPOL Annex VI, as amended,
requires that ships to which chapter 4 applies shall also be subject to survey
and certification taking into account guidelines developed by the Organization,
RECOGNIZING that the aforementioned amendments to MARPOL Annex VI
require relevant guidelines for uniform and effective implementation of the
regulations and to provide sufficient lead time for industry to prepare,
HAVING CONSIDERED, at its seventy-sixth session, draft 2021
Guidelines on survey and certification of the Energy Efficiency Existing Ship
Index (EEXI),
1 ADOPTS the 2021
Guidelines on survey and certification of the Energy Efficiency Existing Ship
Index (EEXI), as set out in the annex to the present resolution;
2 INVITES
Administrations to take the annexed Guidelines into account when developing and
enacting national laws which give force to and implement requirements set forth
in regulation 5 of MARPOL Annex VI;
3 REQUESTS the
Parties to MARPOL Annex VI and other Member Governments to bring the annexed
Guidelines to the attention of masters, seafarers, shipowners, ship operators
and any other interested parties;
4 AGREES to keep the
Guidelines under review in light of experience gained with their implementation
and in light of the review of EEXI regulations to be completed by the
Organization by 1 January 2026 as identified in regulation 25.3 of MARPOL Annex
VI.
ANNEX
2021 GUIDELINES ON SURVEY AND CERTIFICATION OF THE ATTAINED ENERGY
EFFICIENCY EXISTING SHIP INDEX (EEXI)
Table
of contents
1 GENERAL
2 DEFINITIONS
3 APPLICATION
4 PROCEDURES FOR SURVEY
AND CERTIFICATION
4.1 General
4.2 Verification of the
attained EEXI
4.3 Verification of the
attained EEXI in case of major conversion
APPENDIX Sample of EEXI
Technical File
1 GENERAL
The purpose of these guidelines is to assist verifiers of the
Energy Efficiency Existing Ship Index (EEXI) of ships in conducting the survey
and certification of the EEXI, in accordance with regulations 5, 6, 7, 8 and 9
of MARPOL Annex VI, and assist shipowners, shipbuilders, manufacturers and
other interested parties in understanding the procedures for the survey and
certification of the EEXI.
2 DEFINITIONS1
______________
1 Other terms used in
these Guidelines have the same meaning as those defined in the 2018
Guidelines on the method of calculation of the attained EEDI for new ships
(resolution MEPC.308(73), as amended) and the 2021 Guidelines on the
method of calculation of the attained EEXI (resolution MEPC.333(76)).
2.1 Verifier
means an Administration, or organization duly authorized by it, which conducts
the survey and certification of the EEXI in accordance with regulations 5, 6,
7, 8 and 9 of MARPOL Annex VI and these Guidelines.
2.2 Ship of the same
type means a ship the hull form (expressed in the lines such as sheer plan
and body plan), excluding additional hull features such as fins, and principal
particulars of which are identical to that of the base ship.
2.3 Tank test
means model towing tests, model self-propulsion tests and model propeller open
water tests. Numerical calculations may be accepted as equivalent to model
propeller open water tests or used to complement the tank tests conducted (e.g.
to evaluate the effect of additional hull features such as fins, etc. on ships'
performance), or as a replacement for model tests provided that the methodology
and numerical model used have been validated/calibrated against parent hull sea
trials and/or model tests, with the approval of the verifier.
2.4 MARPOL means
the International Convention for the Prevention of Pollution from Ships, 1973,
as modified by the Protocols of 1978 and 1997 relating thereto, as amended.
2.5 For the purpose of
these Guidelines, the definitions in MARPOL Annex VI, as amended, apply.
3 APPLICATION
These Guidelines should be applied to ships for which an
application for a survey for verification of the ship's EEXI specified in
regulation 5 of MARPOL Annex VI has been submitted to a verifier.
4 PROCEDURES FOR
SURVEY AND CERTIFICATION
4.1 General
4.1.1 The attained EEXI
should be calculated in accordance with regulation 23 of MARPOL Annex VI and
the 2021 Guidelines on the method of calculation of the attained
Energy Efficiency Existing Ship Index (EEXI) (resolution MEPC.333(76))
(EEXI Calculation Guidelines).
4.1.2 The 2013 Guidance on
treatment of innovative energy efficiency technologies for calculation and
verification of the attained EEDI (MEPC.1/Circ.815) should be applied for
calculation of the attained EEXI, if applicable.
4.1.3 The information used
in the verification process may contain confidential information of submitters,
including shipyards, which requires Intellectual Property Rights (IPR)
protection. In the case where the submitter wants a non-disclosure agreement
with the verifier, the additional information should be provided to the
verifier upon mutually agreed terms and conditions.
4.2 Verification of the
attained EEXI
4.2.1 For verification of
the attained EEXI, an application for a survey and an EEXI Technical File
containing the necessary information for the verification and other relevant
background documents should be submitted to a verifier, unless the attained
EEDI of the ship satisfies the required EEXI.
4.2.2 The EEXI Technical
File should be written at least in English. The EEXI Technical File should
include, but not be limited to:
.1 deadweight (DWT) or gross tonnage (GT) for
ro-ro passenger ship and cruise passenger ship having non-conventional
propulsion;
.2 the rated installed power (MCR) of
the main and auxiliary engines;
.3 the limited installed power (MCRlim)
in cases where the overridable Shaft / Engine Power Limitation system is
installed;
.4 the ship speed (Vref);
.5 the approximate ship speed (Vref,app)
for pre-EEDI ships in cases where the speed-power curve is not available, as
specified in paragraph 2.2.3.5 of the EEXI Calculation Guidelines;
.6 an approved speed-power curve under the
EEDI condition as specified in paragraph 2.2 of the EEDI Calculation
Guidelines, which is described in the EEDI Technical File, in cases where
regulation 22 of MARPOL Annex VI (Attained EEDI) is applied;
.7 an estimated speed-power curve under the
EEDI condition, or under a different load draught to be calibrated to the EEDI
condition, obtained from tank test and/or numerical calculations, if available;
.8 estimation process and methodology of the
power curves, as necessary, including documentation on consistency with the
defined quality standards (e.g. ITTC 7.5-03-01-02 and ITTC 7.5-03-01-04 in
their latest revisions) and the verification of the numerical set-up with
parent hull or the reference set of comparable ships in case of using numerical
calculations;
.9 a sea trial report including sea trial
results, which may have been calibrated by the tank test, under the sea
condition as specified in paragraph 2.2.2 of the EEDI Calculation Guidelines,
if available;
.10 calculation process of Vref,app
for pre-EEDI ships in cases where the speed-power curve is not available, as
specified in paragraph 2.2.3.5 of the EEXI Calculation Guidelines;
.11 type of fuel;
.12 the specific fuel consumption (SFC)
of the main and auxiliary engines, as specified in paragraph 2.2.3 of the EEXI
Calculation Guidelines;
.13 the electric power table2 for
certain ship types, as necessary, as defined in the EEDI Calculation
Guidelines;
.14 the documented record of annual average
figure of the auxiliary engine load at sea obtained prior to the date of
application for a survey for verification of the ship's EEXI, as specified in
paragraph 2.2.2.3 of the EEXI Calculation Guidelines, if applicable;
.15 calculation process of PAE,app,
as specified in paragraph 2.2.2.3 of the EEXI Calculation Guidelines, if
applicable;
.16 principal particulars, ship type and the
relevant information to classify the ship as such a ship type, classification
notations and an overview of the propulsion system and electricity supply
system on board;
.17 description of energy saving equipment, if
available;
.18 calculated value of the attained EEXI,
including the calculation summary, which should contain, at a minimum, each
value of the calculation parameters and the calculation process used to
determine the attained EEXI; and
.19 for LNG carriers:
.1 type and outline of propulsion systems
(such as direct drive diesel, diesel electric, steam turbine);
.2 LNG cargo tank capacity in m3
and BOR as defined in paragraph 2.2.5.6.3 of the EEDI Calculation Guidelines;
.3 shaft power of the propeller shaft after
transmission gear at 100% of the rated output of motor (MPPMotor)
and ηi for
diesel electric;
.4 shaft power of the propeller shaft after
transmission gear at the de-rated output of motor (MPPMotor,lim)
in cases where the overridable Shaft / Engine Power Limitation is installed;
.5 maximum continuous rated power (MCRSteamTurbine)
for steam turbine;
.6 limited maximum continuous rated power (MCRSteamTurbine,lim)
for steam turbine in cases where the overridable Shaft / Engine Power
Limitation is installed; and
.7 SFCSteamTurbine
for steam turbine, as specified in paragraph 2.2.7.2 of the EEDI
Calculation Guidelines. If the calculation is not available from the manufacturer,
SFCSteamTurbine may be calculated by the submitter.
______________
2 Electric power tables
should be validated separately, taking into account the guidelines set out in
appendix 2 of the 2014 Guidelines on survey and certification of the Energy
Efficiency Design Index (EEDI) (resolution MEPC.254(67), as amended by resolutions MEPC.261(68) and
MEPC.309(73));
consolidated text: MEPC.1/Circ.855/Rev.2,
as may be further amended).
A sample of an EEXI Technical File is provided in the appendix.
4.2.3 The SFC
should be corrected to the value corresponding to the ISO standard reference
conditions using the standard lower calorific value of the fuel oil, referring
to ISO 15550:2002 and ISO 3046-1:2002. For the confirmation of the SFC,
a copy of the approved NOX Technical File and documented summary of
the correction calculations should be submitted to the verifier.
4.2.4 For ships equipped
with dual-fuel engine(s) using LNG and fuel oil, the CF-factor
for gas (LNG) and the specific fuel consumption (SFC) of gas fuel should
be used by applying the criteria specified in paragraph 4.2.3 of the 2014
Guidelines on survey and certification of the Energy Efficiency Design Index
(EEDI), as amended,3 as a basis for the guidance of the
Administration.
________________
3 Resolution MEPC.254(67), as amended.
4.2.5 Notwithstanding
paragraphs 4.2.3 and 4.2.4, in cases where overridable Shaft / Engine Power
Limitation is installed, or in cases where engines do not have a test report
included in the NOX Technical File, SFC should be calculated
in accordance with paragraph 2.2.3 of the EEXI Calculation Guidelines. For this
purpose, actual performance records of the engine may be used if satisfactory
and acceptable to the verifier.
4.2.6 The verifier may
request further information from the submitter, as specified in paragraph 4.2.7
of the EEDI Survey and Certification Guidelines, in addition to that contained
in the EEXI Technical File, as necessary, to examine the calculation process of
the attained EEXI.
4.2.7 In cases where the
sea trial report as specified in paragraph 4.2.2.9 is submitted, the verifier
should request further information from the submitter to confirm that:
.1 the sea trial was
conducted in accordance with the conditions specified in paragraphs 4.3.3,
4.3.4 and 4.3.7 of the EEDI Survey and Certification Guidelines, as applicable;
.2 sea conditions were
measured in accordance with ISO 15016:2002 or the equivalent if satisfactory
and acceptable to the verifier;
.3 ship speed was
measured in accordance with ISO 15016:2002 or the equivalent if satisfactory
and acceptable to the verifier; and
.4 the measured ship
speed was calibrated, if necessary, by taking into account the effects of wind,
tide, waves, shallow water and displacement in accordance with ISO 15016:2002
or the equivalent which may be acceptable provided that the concept of the
method is transparent for the verifier and publicly available/accessible.
4.2.8 The estimated
speed-power curve obtained from the tank test and/or numerical calculations
and/or the sea trial results calibrated by the tank test should be reviewed on
the basis of the relevant documents in accordance with the EEDI Survey and
Certification Guidelines, the defined quality standards (e.g. ITTC 7.5-03-01-02
and ITTC 7.5-03-01-04 in their latest revisions) and the verification of the
numerical set-up with parent hull or the reference set of comparable ships.
4.2.9 In cases where the
overridable Shaft / Engine Power Limitation system is installed, the verifier
should confirm that the system is appropriately installed and sealed in
accordance with the 2021 Guidelines on the Shaft / Engine Power Limitation
system to comply with the EEXI requirements and use of a power reserve
(resolution MEPC.335(76))
and that a verified Onboard Management Manual (OMM) for overridable Shaft /
Engine Power Limitation is on board the ship.
4.3 Verification of the
attained EEXI in case of major conversion
4.3.1 In cases of a major
conversion of a ship taking place at or after the completion date of the survey
for EEXI verification specified in regulation 5.4.7 of MARPOL Annex VI, the
shipowner should submit to a verifier an application for a general or partial
survey with the EEXI Technical File duly revised, based on the conversion made
and other relevant background documents.
4.3.2
The background documents should include
as a minimum, but are not limited to:
.1 details of the
conversion;
.2 EEXI parameters
changed after the conversion and the technical justifications for each
respective parameter;
.3 reasons for other
changes made in the EEXI Technical File, if any; and
.4 calculated value of
the attained EEXI with the calculation summary, which should contain, as a
minimum, each value of the calculation parameters and the calculation process
used to determine the attained EEXI after the conversion.
4.3.3 The verifier should
review the revised EEXI Technical File and other documents submitted and verify
the calculation process of the attained EEXI to ensure that it is technically
sound and reasonable and follows regulation 23 of MARPOL Annex VI and the EEXI
Calculation Guidelines.
4.3.4 For verification of
the attained EEXI after the major conversion, speed trials of the ship may be
conducted, as necessary.
APPENDIX
SAMPLE OF EEXI TECHNICAL FILE
1 Data
1.1 General information
|
Shipowner
|
XXX Shipping Line |
|
Shipbuilder
|
XXX Shipbuilding Company |
|
Hull
no. |
12345 |
|
IMO
no. |
94112XX |
|
Ship
type |
Bulk carrier |
1.2 Principal
particulars
|
Length
overall |
250.0 m |
|
Length
between perpendiculars |
240.0 m |
|
Breadth,
moulded |
40.0 m |
|
Depth,
moulded |
20.0 m |
|
Summer
load line draught, moulded |
14.0 m |
|
Deadweight
at summer load line draught |
150,000 tons |
1.3 Main engine
|
Manufacturer
|
XXX Industries |
|
Type
|
6J70A |
|
Maximum
continuous rating (MCRME) |
15,000 kW x 80 rpm |
|
Limited maximum continuous rating with the Engine Power
Limitation installed (MCRME,lim) |
9,940 kW x 70 rpm |
|
SFC
at 75% of MCRME or 83% of MCRME,lim |
166.5 g/kWh |
|
Number
of sets |
1 |
|
Fuel
type |
Diesel Oil |
1.4 Auxiliary engine
|
Manufacturer
|
XXX Industries |
|
Type
|
5J-200 |
|
Maximum
continuous rating (MCRAE) |
600 kW x 900 rpm |
|
SFC
at 50% MCRAE |
220.0 g/kWh |
|
Number
of sets |
3 |
|
Fuel
type |
Diesel Oil |
1.5 Ship speed
|
Ship
speed (Vref) (with the Engine Power Limitation installed) |
13.20 knots |
2 Power curve
(Example 1; case of the EEDI ship)
An approved speed-power curve contained in the EEDI Technical File
is shown in figure 2.1.
(Example 2; case of the pre-EEDI ship)
An estimated speed-power curve obtained from the tank test and/or
numerical calculations, if available, is also shown in figure 2.1.

Figure
2.1: Power curve
(Example 3; case of the
pre-EEDI ship with sea trial result calibrated to a different load draught) An
estimated speed-power curve under a ballast draught calibrated to the design
load draught, obtained from the tank test and/or numerical calculations, if
available, is shown in figure 2.2.

Figure
2.2: Power curve
3 Overview of
propulsion system and electric power supply system
3.1 Propulsion system
3.1.1
Main engine
Refer to paragraph 1.3 of this appendix.
3.1.2
Propeller
|
Type
|
Fixed pitch propeller |
|
Diameter
|
7.0 m |
|
Number
of blades |
4 |
|
Number
of sets |
1 |