MEPC.1/Circ.855/Rev.2
14 January 2019
2014
GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY EFFICIENCY DESIGN INDEX
(EEDI), AS AMENDED (RESOLUTION MEPC.254(67), AS AMENDED BY RESOLUTION
MEPC.261(68) AND RESOLUTION MEPC.309(73))
1 The Marine Environment
Protection Committee, at its seventy-third session (22 to 26 October 2018),
adopted, by resolution MEPC.309(73),
amendments to the 2014 Guidelines on survey and certification of the Energy
Efficiency Design Index (EEDI) (resolution MEPC.254(67), as amended by resolution MEPC.261(68)). A
revised consolidated text of the Guidelines, as requested by the Committee
(MEPC 73/19, paragraph 5.87), is set out in the annex.
2 Member Governments
are invited to bring the annexed 2014 Guidelines on survey and certification
of the Energy Efficiency Design Index (EEDI), as amended, to the attention
of Administrations, industry, relevant shipping organizations, shipping companies
and other stakeholders concerned.
3 This circular
revokes MEPC.1/Circ.855/Rev.1.
ANNEX
2014 GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY
EFFICIENCY DESIGN INDEX (EEDI), AS AMENDED (RESOLUTION MEPC.254(67), AS AMENDED
BY RESOLUTION MEPC.261(68) AND RESOLUTION MEPC.309(73))
Table
of contents
1 GENERAL
2 DEFINITIONS
3 APPLICATION
4 PROCEDURES FOR
SURVEY AND CERTIFICATION
4.1 General
4.2 Preliminary
verification of the attained EEDI at the design stage
4.3 Final verification of
the attained EEDI at sea trial
4.4 Verification of the
attained EEDI in case of major conversion
Appendix
1 Sample of EEDI Technical File
Appendix
2 Guidelines for validation of
electric power tables for EEDI (EPT-EEDI)
Appendix 3 Electric
power table form for EEDI (EPT-EEDI Form) and statement of validation
1 GENERAL
The purpose of these guidelines is to assist verifiers of the
Energy Efficiency Design Index (EEDI) of ships in conducting the survey and
certification of the EEDI, in accordance with regulations 5, 6, 7, 8 and 9 of
MARPOL Annex VI, and assist shipowners, shipbuilders, manufacturers and other
interested parties in understanding the procedures for the survey and
certification of the EEDI.
2 DEFINITIONS1
_____________
1 Other terms used in
these guidelines have the same meaning as those defined in the 2018
Guidelines on the method of calculation of the attained EEDI for new ships
(resolution MEPC.308(73)).
2.1 Verifier
means an Administration, or organization duly authorized by it, which conducts
the survey and certification of the EEDI in accordance with regulations 5, 6,
7, 8 and 9 of MARPOL Annex VI and these Guidelines.
2.2 Ship of the same
type means a ship the hull form (expressed in the lines such as sheer plan
and body plan), excluding additional hull features such as fins, and principal
particulars of which are identical to that of the base ship.
2.3 Tank test means
model towing tests, model self-propulsion tests and model propeller open water
tests. Numerical calculations may be accepted as equivalent to model propeller
open water tests or used to complement the tank tests conducted (e.g. to
evaluate the effect of additional hull features such as fins, etc. on ships'
performance) with the approval of the verifier.
3 APPLICATION
These guidelines should be applied to new ships for which an
application for an initial survey or an additional survey specified in
regulation 5 of MARPOL Annex VI has been submitted to a verifier.
4 PROCEDURES FOR
SURVEY AND CERTIFICATION
4.1 General
4.1.1 The attained EEDI
should be calculated in accordance with regulation 20 of MARPOL Annex VI and
the 2018 Guidelines on the method of calculation of the attained Energy
Efficiency Design Index (EEDI) for new ships (resolution MEPC.308(73))
(EEDI Calculation Guidelines). Survey and certification of the EEDI should be
conducted in two stages: preliminary verification at the design stage and final
verification at the sea trial. The basic flow of the survey and certification
process is presented in figure 1.
4.1.2 The information used
in the verification process may contain confidential information of submitters
which requires Intellectual Property Rights (IPR) protection. In the case where
the submitter wants a non-disclosure agreement with the verifier, the
additional information should be provided to the verifier upon mutually agreed
terms and conditions.

* To be conducted by a
test organization or a submitter.
Figure 1: Basic flow of survey and certification process
4.2 Preliminary
verification of the attained EEDI at the design stage
4.2.1 For the preliminary
verification at the design stage, an application for an initial survey and an
EEDI Technical File containing the necessary information for the verification
and other relevant background documents should be submitted to a verifier.
4.2.2 The EEDI Technical
File should be written at least in English. The EEDI Technical File should
include as a minimum, but not limited to:
.1 deadweight (DWT) or
gross tonnage (GT) for passenger and ro-ro passenger ships, the maximum
continuous rating (MCR) of the main and auxiliary engines, the ship speed (Vref),
as specified in paragraph 2.2.2 of the EEDI Calculation Guidelines, type of
fuel, the specific fuel consumption (SFC) of the main engine at 75% of
MCR power, the SFC of the auxiliary engines at 50% MCR power, and the
electric power table2 for certain ship types, as necessary, as
defined in the EEDI Calculation Guidelines;
______________
2 Electric power tables
should be validated separately, taking into account the guidelines set out in
appendix 2.
.2 power curve(s) (kW - knot) estimated at
design stage under the condition as specified in paragraph 2.2.2 of the EEDI
Calculation Guidelines, and, in the event that the sea trial is carried out in
a condition other than the above condition, also a power curve estimated under
the sea trial condition;
.3 principal particulars, ship type and the
relevant information to classify the ship as such a ship type, classification
notations and an overview of the propulsion system and electricity supply
system on board;
.4 estimation process and methodology of the
power curves at design stage;
.5 description of energy saving equipment;
.6 calculated value of the attained EEDI,
including the calculation summary, which should contain, at a minimum, each
value of the calculation parameters and the calculation process used to determine
the attained EEDI;
.7 calculated values of the attained EEDIweather
and fw value (not equal to 1.0), if those values are
calculated, based on the EEDI Calculation Guidelines; and
.8 for LNG carriers:
.1 type and outline of propulsion systems
(such as direct drive diesel, diesel electric, steam turbine);
.2 LNG cargo tank capacity in m3
and BOR as defined in paragraph 2.2.5.6.3 of the EEDI Calculation Guidelines;
.3 shaft power of the propeller shaft after
transmission gear at 100% of the rated output of motor (MPPMotor)
and η(i) for
diesel electric;
.4 maximum continuous rated power (MCRSteamTurbine)
for steam turbine; and
.5 SFCSteamTurbine for
steam turbine, as specified in paragraph 2.2.7.2 of the EEDI Calculation
Guidelines.
A sample of an EEDI Technical File is provided in appendix 1.
4.2.3 For ships equipped
with dual-fuel engine(s) using LNG and fuel oil, the CF-factor
for gas (LNG) and the specific fuel consumption (SFC) of gas fuel should
be used by applying the following criteria as a basis for the guidance of the
Administration:
.1 final decision on the primary fuel rests
with the Administration;
.2 the ratio of calorific value of gas fuel
(LNG) to total marine fuels (HFO/MGO), including gas fuel (LNG) at design conditions
should be equal to or larger than 50% in accordance with the formula below.
However, the Administration can accept a lower value of the percentage taking
into account the intended voyages:

whereby:
Vgas
is the total net tank volume of gas fuel on board in m3;
Vliquid
is the total net tank volume of every liquid fuel on board in m3;
ρgas is
the density of gas fuel in kg/m3;
ρliquid is
the density of every liquid fuel in kg/m3;
LCVgas is
the low calorific value of gas fuel in kJ/kg;
LCVliquid is
the low calorific value of liquid fuel in kJ/kg;
Kgas is
the filling rate for gas fuel tanks;
Kliquid is
the filling rate for liquid fuel tanks.
Normal
density, Low Calorific Value and filling rate for tanks of different kinds of
fuel are listed below.
|
Type
of fuel |
Density
(kg/m3)
|
Low Calorific Value (kJ/kg) |
Filling
rate for tanks |
|
Diesel/Gas
Oil |
900
|
42700
|
0.98
|
|
Heavy
Fuel Oil |
991
|
40200
|
0.98
|
|
Liquefied
Natural Gas (LNG) |
450
|
48000
|
0.95*
|
*
Subject to verification of tank filling limit.
.3 in case the ship is not fully equipped
with dual-fuel engines, the CF-factor for gas (LNG) should apply only for those
installed engines that are of dual-fuel type and sufficient gas fuel supply
should be available for such engines; and
.4 LNG fuelling solutions with exchangeable
(specialized) LNG tank-containers should also fall under the terms of LNG as
primary fuel.
4.2.4 The SFC
of the main and auxiliary engines should be quoted from the approved NOX Technical
File and should be corrected to the value corresponding to the ISO standard
reference conditions using the standard lower calorific value of the fuel oil
(42,700 kJ/kg), referring to ISO 15550:2002 and ISO 3046-1:2002. For the
confirmation of the SFC, a copy of the approved NOX Technical
File and documented summary of the correction calculations should be submitted
to the verifier. In cases where the NOX Technical File has not been
approved at the time of the application for initial survey, the test reports
provided by manufacturers should be used. In this case, at the time of the sea
trial verification, a copy of the approved NOX Technical File and
documented summary of the correction calculations should be submitted to the
verifier. In the case that gas fuel is determined as primary fuel in accordance
with paragraph 4.2.3 and that installed engine(s) have no approved NOX
Technical File tested in gas mode, the SFC of gas mode should be
submitted by the manufacturer and confirmed by the verifier.
Note: SFC in
the NOX Technical File are the values of a parent engine, and the
use of such value of SFC for the EEDI calculation for member engines may
have the following technical issues for further consideration:
.1 the definition of "member
engines" given in the NOX Technical File is broad and
specification of engines belonging to the same group/family may vary; and
.2 the rate of NOX emission of the
parent engine is the highest in the group/family - i.e. CO2
emission, which is in the trade-off relationship with NOX emission,
can be lower than the other engines in the group/family.
4.2.5 For ships to which
regulation 21 of MARPOL Annex VI applies, the power curves used for the
preliminary verification at the design stage should be based on reliable
results of tank tests. A tank test for an individual ship may be omitted based
on technical justifications such as availability of the results of tank tests
for ships of the same type. In addition, the omission of tank tests is
acceptable for a ship for which sea trials will be carried out under the
condition as specified in paragraph 2.2.2 of the EEDI Calculation Guidelines,
upon agreement of the shipowner and shipbuilder and with the approval of the
verifier. To ensure the quality of tank tests, the ITTC quality system should
be taken into account. Model tank tests should be witnessed by the verifier.
Note: It
would be desirable in the future that an organization conducting a tank test be
authorized.
4.2.6 The verifier may
request further information from the submitter, in addition to that contained
in the EEDI Technical File, as necessary, to examine the calculation process of
the attained EEDI. For the estimation of the ship speed at the design stage
much depends on each shipbuilder's experience, and it may not be practicable
for any person/organization other than the shipbuilder to fully examine the
technical aspects of experience-based parameters, such as the roughness
coefficient and wake scaling coefficient. Therefore, the preliminary
verification should focus on the calculation process of the attained EEDI to
ensure that it is technically sound and reasonable and follows regulation 20 of
MARPOL Annex VI and the EEDI Calculation Guidelines.
Note
1: A possible way forward for more robust verification is to
establish a standard methodology of deriving the ship speed from the outcome of
tank tests, by setting standard values for experience-based correction factors
such as roughness coefficient and wake scaling coefficient. In this way,
ship-by-ship performance comparisons could be made more objectively by
excluding the possibility of arbitrary setting of experience-based parameters.
If such standardization is sought, this would have an implication on how the
ship speed adjustment based on sea trial results should be conducted, in
accordance with paragraph 4.3.8 of these Guidelines.
Note
2: A joint industry standard to support the method and role of the
verifier is expected to be developed.
4.2.7 Additional
information that the verifier may request the submitter to provide includes,
but is not limited to:
.1 descriptions of a tank test facility; this
should include the name of the facility, the particulars of tanks and towing
equipment, and the records of calibration of each monitoring equipment;
.2 lines of a model ship and an actual ship
for the verification of the appropriateness of the tank test; the lines (sheer
plan, body plan and half-breadth plan) should be detailed enough to demonstrate
the similarity between the model ship and the actual ship;
.3 lightweight of the ship and displacement
table for the verification of the deadweight;
.4 detailed report on the method and results
of the tank test; this should include at least the tank test results at sea
trial condition and under the condition as specified in paragraph 2.2.2 of the
EEDI Calculation Guidelines;
.5 detailed calculation process of the ship
speed, which should include the basis for the estimation of experience-based
parameters such as roughness coefficient and wake scaling coefficient;
.6 reasons for exempting a tank test, if
applicable; this should include lines and tank test results of ships of the
same type, and the comparison of the principal particulars of such ships and
the ship in question. Appropriate technical justification should be provided,
explaining why the tank test is unnecessary; and
.7 for LNG carriers, detailed calculation
process of PAE and SFCSteamTurbine.
4.2.8 The verifier should
issue the report on the Preliminary Verification of the EEDI after it has
verified the attained EEDI at the design stage, in accordance with paragraphs
4.1 and 4.2 of these Guidelines.
4.3 Final verification
of the attained EEDI at sea trial
4.3.1 Sea trial conditions
should be set as the conditions specified in paragraph 2.2.2 of the EEDI
Calculation Guidelines, if possible.
4.3.2 Prior to the sea
trial, the following documents should be submitted to the verifier: a
description of the test procedure to be used for the speed trial, the final
displacement table and the measured lightweight, or a copy of the survey report
of deadweight, as well as a copy of the NOX Technical File, as
necessary. The test procedure should include, as a minimum, descriptions of all
necessary items to be measured and corresponding measurement methods to be used
for developing power curves under the sea trial condition.
4.3.3 The verifier should
attend the sea trial and confirm:
.1 propulsion and power supply system,
particulars of the engines or steam turbines, and other relevant items
described in the EEDI Technical File;
.2 draught and trim;
.3 sea conditions;
.4 ship speed; and
.5 shaft power and RPM.
4.3.4 Draught and trim
should be confirmed by the draught measurements taken prior to the sea trial.
The draught and trim should be as close as practical to those at the assumed
conditions used for estimating the power curves.
4.3.5 Sea conditions
should be measured in accordance with ITTC Recommended Procedure 7.5-04-01-01.1
Speed and Power Trials 2017 or ISO 15016:2015.
4.3.6 Ship speed should be
measured in accordance with ITTC Recommended Procedure 7.5-04-01-01.1 Speed and
Power Trials 2017 or ISO 15016:2015, and at more than two points of which range
includes the power of the main engine as specified in paragraph 2.2.5 of the
EEDI Calculation Guidelines.
4.3.7 The main engine
output, shaft power of propeller shaft (for LNG carriers having diesel electric
propulsion system) or steam turbine output (for LNG carrier having steam
turbine propulsion system) should be measured by shaft power meter or a method
which the engine manufacturer recommends and the verifier approves. Other
methods may be acceptable upon agreement of the shipowner and shipbuilder and
with the approval of the verifier.
4.3.8 The submitter should
develop power curves based on the measured ship speed and the measured output
of the main engine at sea trial. For the development of the power curves, the
submitter should calibrate the measured ship speed, if necessary, by taking
into account the effects of wind, current, waves, shallow water, displacement,
water temperature and water density in accordance with ITTC Recommended
Procedure 7.5-04-01-01.2 Speed and Power Trials 2017 or ISO 15016:2015. Upon
agreement with the shipowner, the submitter should submit a report on the speed
trials including details of the power curve development to the verifier for
verification.
4.3.9 The submitter should
compare the power curves obtained as a result of the sea trial and the
estimated power curves at the design stage. In case differences are observed,
the attained EEDI should be recalculated, as necessary, in accordance with the
following:
.1 for ships for which sea trial is conducted
under the condition as specified in paragraph 2.2.2 of the EEDI Calculation
Guidelines: the attained EEDI should be recalculated using the measured ship
speed at sea trial at the power of the main engine as specified in paragraph
2.2.5 of the EEDI Calculation Guidelines; and
.2 for ships for which sea trial cannot be
conducted under the condition as specified in paragraph 2.2.2 of the EEDI
Calculation Guidelines: if the measured ship speed at the power of the main
engine as specified in paragraph 2.2.5 of the EEDI Calculation Guidelines at
the sea trial conditions is different from the expected ship speed on the power
curve at the corresponding condition, the shipbuilder should recalculate the
attained EEDI by adjusting ship speed under the condition as specified in
paragraph 2.2.2 of the EEDI Calculation Guidelines by an appropriate correction
method that is agreed by the verifier.
.3 An example of the scheme of conversion
from trial condition to EEDI condition at EEDI power is given as follows:
Vref is
obtained from the results of the sea trials at trial condition using the
speed-power curves predicted by the tank tests. The tank tests shall be carried
out at both draughts: trial condition corresponding to that of the S/P trials
and EEDI condition. For trial conditions the power ratio αP
between model test prediction and sea trial result is calculated for constant
ship speed. Ship speed from model test prediction for EEDI condition at EEDI
power multiplied with αP is Vref.
αP = PTrial,P
/ PTrial,S
where:
PTrial,P : power at trial condition predicted by the
tank tests
PTrial,S : power at trial condition obtained by the
S/P trials
αP: power ratio
.4 Figure 2 shows an example of the scheme of
conversion to derive the resulting ship speed at EEDI condition (Vref)
at EEDI power.

Figure 2: An example of scheme of conversion from trial condition
to EEDI condition at EEDI power
Note:
Further consideration would be necessary for speed adjustment methodology in
paragraphs 4.3.9.2 to 4.3.9.4 of these Guidelines. One of the concerns relates
to a possible situation where the power curve for sea trial condition is
estimated in an excessively conservative manner (i.e. power curve is shifted in
a leftward direction) with the intention to get an upward adjustment of the
ship speed by making the measured ship speed at sea trial easily exceed the
lower-estimated speed for sea trial condition at design stage.
4.3.10 In cases where the
finally determined deadweight/gross tonnage differs from the designed
deadweight/gross tonnage used in the EEDI calculation during the preliminary
verification, the submitter should recalculate the attained EEDI using the
finally determined deadweight/gross tonnage. The finally determined gross
tonnage should be confirmed in the Tonnage Certificate of the ship.
4.3.11 The electrical
efficiency η(i)
should be taken as 91.3% for the purpose of calculating the attained EEDI.
Alternatively, if a value of more than 91.3% is to be applied, η(i)
should be obtained by measurement and verified by a method approved by the
verifier.
4.3.12 In case where the
attained EEDI is calculated at the preliminary verification by using SFC
based on the manufacturer's test report, due to the non-availability at that
time of the approved NOX Technical File, the EEDI should be recalculated
by using SFC in the approved NOX Technical File. Also, for
steam turbines, the EEDI should be recalculated by using SFC confirmed
by the Administration, or an organization recognized by the Administration, at
the sea trial.
4.3.13 The EEDI Technical
File should be revised, as necessary, by taking into account the results of sea
trials. Such revision should include, as applicable, the adjusted power curve
based on the results of sea trials (namely, modified ship speed under the
condition as specified in paragraph 2.2.2 of the EEDI Calculation Guidelines),
the finally determined deadweight/gross tonnage, η for LNG carriers having
diesel electric propulsion system and SFC described in the approved NOX
Technical File, and the recalculated attained EEDI based on these
modifications.
4.3.14 The EEDI Technical
File, if revised, should be submitted to the verifier for confirmation that the
(revised) attained EEDI is calculated in accordance with regulation 20 of
MARPOL Annex VI and the EEDI Calculation Guidelines.
4.4 Verification of the
attained EEDI in case of major conversion
4.4.1 In cases of a major
conversion of a ship, the shipowner should submit to a verifier an application
for an additional survey with the EEDI Technical File duly revised, based on
the conversion made and other relevant background documents.
4.4.2 The background
documents should include as a minimum, but are not limited to:
.1 details of the conversion;
.2 EEDI parameters changed after the
conversion and the technical justifications for each respective parameter;
.3 reasons for other changes made in the EEDI
Technical File, if any; and
.4 calculated value of the attained EEDI with
the calculation summary, which should contain, as a minimum, each value of the
calculation parameters and the calculation process used to determine the
attained EEDI after the conversion.
4.4.3 The verifier should
review the revised EEDI Technical File and other documents submitted and verify
the calculation process of the attained EEDI to ensure that it is technically
sound and reasonable and follows regulation 20 of MARPOL Annex VI and the EEDI
Calculation Guidelines.
4.4.4 For verification of
the attained EEDI after a conversion, speed trials of the ship are required, as
necessary.
APPENDIX 1
SAMPLE OF EEDI TECHNICAL FILE
1 Data
1.1 General information