1 The Maritime
Safety Committee, at its seventieth session (7 to 11 December 1998), considered
Guidelines for safe ocean towing, as prepared by the Sub-Committee on Ship Design
and Equipment (DE) at its forty-first session (9 to 13 March 1998) and, in
order to enhance safety of navigation and environmental protection, agreed to
the need for such Guidelines for commercial towing operations which, by their
nature, are not salvage or rescue towing services.
2 Recalling the
adoption by the eighteenth session of the Assembly of resolution A.765(18) on
Guidelines on the safety of towed ships and other floating objects, including
installations, structures and platforms at sea and the availability of guidance
to minimize the danger to navigation from towed objects, which have broken
adrift from the towing vessel, have grounded or are out of control, the
Committee approved the Guidelines for safe ocean towing, as set out in the
annex.
3 Member
Governments are invited to implement the annexed Guidelines and bring them to
the attention of all parties concerned with ocean towing operations.
1
PURPOSE
The objectives of these Guidelines are to ensure safety at sea,
prevention of human injury or loss of life, avoidance of damage to the
environment, in particular to the marine environment, and to property through
providing minimum recommendations for the organization, planning and execution
of ocean towages and the design of associated equipment.
2
APPLICATION
2.1 These Guidelines are applicable
to international ocean towing operations from one State to another State.
However, these guidelines may also be used for any other ocean towing
operation.
2.2 These Guidelines do only apply
to commercial towage operations, which are not in the nature of salvage.
However, amongst towing vessels available to undertake such towing, priority
should be given to those which are fitted to the nearest extent in line with
section 12.
2.3 The status of these Guidelines
is advisory.
3 DEFINITIONS
|
Bollard Pull (BP)
|
- |
Documented continuous bollard pull |
|
Breaking Load (BL)
|
- |
Documented minimum breaking load |
|
Ocean towing |
- |
Towing operations
where the distance between designated ports of refuge or safe anchoring along
the route is more than 24 hours, taken into account weather conditions. |
|
Tow |
- |
The towing vessel,
including towing vessel equipment and the towed object including its towing
equipment, cargo and cargo securing |
|
Towage |
- |
The complete towing operation
|
|
Towing equipment |
- |
All towing equipment
on the towing vessel and the towed object used to effect the towage |
|
Towing master |
- |
The manager
responsible for the towage. A Tug master may be designated as Towing master |
|
Tug master |
- |
The master of a towing
vessel |
|
1 and 10-year return periods |
- |
The most unfavourable
combination of extreme environmental conditions, comprising wind, wave and
current, that can be expected statistically every 1 and 10 years
respectively. |
4
RESPONSIBILITIES
4.1 Organizational command lines
should be established and responsibilities and duties clearly defined before a
towage commences.
4.2 The towing operation should be
in charge of a competent towing master, normally being either the master of the
towing vessel or the master of the leading towing vessel, in case the towed
object is towed by more than one towing vessel.
4.3 The towing master is responsible
for the towing operation. In preparation for the towing operation, the towing
master should consider these guidelines, as appropriate. The towing master
should also consider what regulations are applicable during the towage, as well
as ensuring that all relevant safety measures as he finds necessary are
implemented.
4.4 Nothing in this section shall
set aside or limit the towing master's/tug master's authority in accordance
with maritime laws.
5
MANNING OF TOWING VESSELS AND TOWED OBJECTS
5.1 Towing vessels should be manned
to operate the towing vessel on a 24-hour basis in accordance with the STCW
Code.
5.2 The manning should also, in
addition to operating the vessel, be sufficient to ensure that it will be
possible to:
-
establish a new towing connection; and
-
board the unmanned towed object, if planned, in an emergency situation.
5.3 If the towed object is manned,
the number of personnel on board the towed object should, as far as possible,
be limited to the necessary crew only.
5.4 Considerations should be given
to the need to safely transfer personnel and equipment between the towing
vessel and the towed object when such operation is planned to take place in an
emergency situation. Personnel under transfer should have life jackets or
immersion suits, carry suitable radiocommunication equipment and portable
lights. In selecting immersion suits, due regard should be given to the degree
of body heat-loss protection necessary in the area of operation.
6
PLANNING
6.1 All aspects of the towage should
be planned in advance, taking into account such factors as maximum anticipated
environmental conditions as reflected in section 9.1, including tidal streams,
current and water depths, as well as the size, windage, displacement and draft
of the tow. Possible cargo and cargo securing arrangements on board the towed
object should also be taken into consideration. Strength calculation of
non-routine cargo securing arrangements should be carried out. Weather routeing
advice should be obtained and used where available and appropriate, and careful
consideration given to the bollard pull of the towing vessel(s) to be employed,
cf. section 9.4. The towing arrangements and procedures should be such as to
reduce to a minimum any danger to personnel during the towing operations.
6.2 There should be a contingency
plan on board the towing vessel to cover the onset of adverse weather,
particularly in respect of arrangements for heaving to or taking shelter.
Personnel should be familiarized with their responsibilities and duties in an
emergency situation in accordance with this contingency plan. If the towed
object is manned, the contingency plan should also be carried on such object.
6.3 There should be operation or
towing manuals on board the towing vessel which describe routine towing
operations and additional manuals to describe any special towage requirements,
of which due account should be taken.
7
PREPARATION
7.1 The tow should not proceed to
sea until a satisfactory inspection of the tow has been carried out by the
towing master and, if requested or for any reason considered necessary, by any
other competent person.
7.2 The towing operation should not
commence unless the environmental conditions prevailing, and forecast, will
allow the tow to achieve safe sea room where the tow is not endangered by a lee
shore or other navigational hazards.
7.3 Where operational limitations
have been identified for the tow, procedures should be put in place to prevent
the tow encountering conditions in excess of the limitations. Such procedures
may include weather routeing or safe shelter locations, or both.
8
SURVEY
In cases, where particular circumstances or factors signify an increased
risk to the tow, or where the risk cannot be evaluated on the basis of
seafaring and nautical knowledge and experience alone, the owner of the towing
vessel, owner(s) of the towed object or the towing master/tug master should
apply for survey in accordance with these guidelines by a competent
organization or authority, as appropriate.
9
DESIGN ENVIRONMENTAL CONDITIONS
9.1 The towed object, including
cargo and securing arrangements, should be capable to withstand the loads
caused by the most adverse environmental conditions expected for the season and
areas in question.*
9.2 The duration of a towing
operation is measured from the time the operation is started until the tow is
in a safe condition at its arrival location. If there are locations along the
route where the towed object can safely be located, the duration of the towing
operation can be measured between such locations.
9.3 For long duration towing
operations passing through areas having different sea state characteristics,
the worst sea state for the route should be considered when selecting the cargo
securing arrangements and the equipment to ensure watertight integrity of the
towed object.
9.4 The continuous bollard pull of
the towing vessel(s) involved should be sufficient to maintain station keeping
of the tow in the following environmental conditions, acting in the same
direction:
-
Wind: 20 m/s
-
Significant wave height: 5 m
-
Current: 0.5 m/s
___________
________________
*
If found appropriate, the following guidance for design
environmental conditions should apply:
|
Duration of towing operation
|
Return period |
|
< 5 days > 5 days |
1 year 10 year |
Other criteria may be acceptable if high confidence on the weather
forecasts and experience data for the actual waters can be obtained.
10
WEATHER FORECAST
10.1 Where possible a weather forecasting source
should be available on a 24-hour basis for the whole towing operation.
10.2 Weather forecasts should, as a minimum,
contain the following information:
-
Synopsis of the area
-
Wind speed and direction
-
Wave height and period
-
Swell height and period
-
Outlook for the next 48 hours.
10.3 In certain high risk situations, or when
such forecast may be seasonally unpredictable, consideration should be given to
obtaining a second weather forecast.
10.4 Weather forecasts should be received on the
towing vessel (and received or relayed on the towed object if manned) at least
every 24 hours during the towage. Where there are specific weather limitations
imposed, then more frequent forecasts may be appropriate, and possible direct
communication with the forecaster if significant changes are expected.
11
TOWING VESSEL REQUIREMENTS
11.1 Towing vessels should carry on board
appropriate valid cargo ships certificates according to their size.
The following documents should also be provided:
-
Documentation of bollard pull
-
Documentation of all towing vessel equipment, ref. section 12
11.2 The continuous bollard pull (BP) at maximum
continuous rated power of the main propulsion machinery should be documented.
The testing procedure in Appendix A or a similar procedure should be adhered
to.
11.3 When selecting towing vessels for long
distance towing operations, special considerations should be given to the
following:
-
the vessels propulsion and steering gear are appropriate for the proposed
towage operation;
-
the towline should not hamper the vessel's manoeuvrability under extreme
environmental conditions; and
-
the towing gear can be handled safely and effectively.
11.4 Towing vessels should have an adequate
reserve of fuel depending on the duration of the towing operation. If
refuelling on route is necessary, suitable arrangements should be provided
before towing commences.
11.5 Towing vessels should keep a towing log
with information according to Appendix B. Further, it should keep an engine log
for main propulsion machinery and auxiliaries required for the towage, which as
a minimum should contain information related to running hours and unscheduled
events.
11.6 Towing vessels should have a documented
maintenance system for all important systems including communication and
navigation equipment, main and auxiliary machinery, and steering and towing
gear.
11.7 Notwithstanding the above requirements, all
towing vessels, irrespective of their size, should have as a minimum:
.1
marine radar in compliance with relevant recognized performance standards
appropriate for the size and operation of the vessel;
.2
adequate self-sufficient fire suppression capability;
.3
installation of the following equipment:
.3.1
a searchlight that can
be directed from the vessel's main steering station;
.3.2
two VHF-FM radios with
Digital Selective Calling capability if not already equipped with Global Maritime Distress Safety
System (GMDSS);
.3.3
an illuminated card
type magnetic steering compass or an illuminated flux gate magnetic compass (with a reserve
power supply) that can be read at the vessel's main steering station;
.3.4
an echo depth-sounding
device that can be read at the vessel's main steering station; and
.3.5
an electronic
positioning device; and
.4
the following on board:
.4.1
currently corrected
marine charts of the area to be transited, published by an appropriate authority, of a scale
large enough to make navigation of the area possible; and
.4.2
any other useful
currently corrected navigational publications and notices.
12
TOWING EQUIPMENT
12.1 The towing equipment should be designed
according to the below mentioned recommendations and recognized standards. The
towing arrangements should be suitable for the particular tow and of adequate
strength.
12.2 The towing vessel should be equipped with a
towing winch.
12.3 It is recommended that the towing winch
brakes should have an appropriate static holding capacity to that of the
documented minimum breaking load (MBL) of the largest towline to be used. The
holding capability should be calculated for the outermost towline layer on the
winch drum at which towing will be performed.
12.4 The design and scantling of the towing
winch, including supports, should be capable of withstanding the breaking load
of the main towing wire rope without permanent deformation.
12.5 It should be possible to release the
tension on the winch drum(s) in an emergency and in all operational modes. The
end attachment of the towing wire rope to the winch drum should be of limited
strength, thus forming a weak link in case the towline has to be run out. After
an emergency release the winch brakes should revert to normal function without
delay. It should also be possible to carry out the emergency release sequence
(emergency release/application of brakes) even during a black-out.
12.6 It is recommended that on board towing
vessels, whenever practicable, the winch should be fitted with equipment for
measuring the tension in the towline. This equipment should, as a minimum,
record the mean tension and the tension peaks, and the information should be displayed
in the wheel house.
12.7 Means should be provided to spool the
towline effectively on the drum(s).
12.8 Towline protection sleeves, or other means
should be provided to prevent the towlines being damaged by chafing or
abrasion. There should be no sharp edges or obstructions at the stern of the
vessel that may damage the towlines during operation. A sufficient number of
spare towline sleeves should be carried on board.
12.9 An appropriate length for the towline
should be determined using established criteria. Where no such criteria has
been established, the minimum required length (L) of the main towline should be
determined from the formula;
L= (BP/BL)x1800 m
where:
BL =
Documented breaking load of the towline,
BP =
Continuous bollard pull
12.10 All wire ropes in use should have the same lay (i.e.
right hand, left hand, etc.).
12.11 The minimum documented breaking load (MBL) of the main
towline should generally be in accordance with the following table.
|
Bollard pull (BP) (tonnes)
|
<40 |
40-90 |
>90 |
|
MBL (tonnes) |
3.0xBP |
(3.8-BP/50) BP |
2.0xBP |
12.12 A spare towline satisfying all requirements for the main towline
should be kept on board the towing vessel.
If the towing winch is equipped with two drums the spare towline should
preferably be stored on the winch drum, readily available for use.
The alternative is to have a spare towline which should be in position
and so arranged to ensure that transfer to the main towing drum is easily,
quickly and safely effected.
In case of two towed objects whereby two independent towlines (main and
spare) are to be connected, an extra spare towline should be on board, arranged
as specified above.
12.13 All wire rope terminations should be hard eyes, i.e.
reinforced thimbles or spelter sockets except for the end connection to the
drum on the towing winch.
12.14 All connecting items like shackles, rings, etc.,
should have an ultimate load bearing capacity of minimum 50% in excess of the
documented minimum breaking load (MBL) of the towing arrangement to be used.
12.15 If fibre rope pennants are used, the pennants should
be in a sound condition and the minimum breaking load of any fibre rope
pennants should not be less than:
-
2.0 times the tow line MBL, for tugs with bollard pull less than 50 tonnes;
-
1.5 times the tow line MBL, for tugs with bollard pull greater than 100 tonnes;
and
-
linearly interpolated between 1.5 and 2.0 times the tow line MBL for tugs with
bollard pull between 50 and 100 tonnes.
Fibre rope pennants should be of grommet construction and be terminated
with hard eyes, and should not normally be connected directly to the apex of
the towing bridle.
12.16 The towing vessel should be equipped with sufficient
spare equipment to completely replicate the towing arrangements, unless found
impractical.
12.17 Inspection of the towline should be carried out on
completion of each towing operation. The results of the inspection should
always be recorded as a basis for decision on future inspection programs. The
inspection should also be noted on the towing log (Appendix B ).
12.18 No part of any towline arrangement should be used for
the towing operation if:
-
the reduction in cross sectional area due to wear, abrasion, corrosion and
broken wires exceeds 10% or there is severe kinking, crushing or other damage
resulting in distortion of the rope structure;
-
end sockets or other towline terminations such as thimbles, etc., are damaged,
deformed or significantly corroded.
12.19 If relevant, gog ropes or alternative arrangement
should be provided to prevent athwartship pull, and to facilitate retrieving of
the towline. The arrangement should be remotely operated from a safe position.
A spare gog rope should be carried on board.
13
TOWED OBJECT
13.1 Every towed object, whether manned or not,
should be assessed and provided with a confirmation of its fitness to be towed,
covering all below mentioned requirements.
13.2 The towed object should have adequate intact
stability in all the loaded and ballast conditions expected during the voyage.
Compliance with any applicable damage stability criteria should be verified, if
not unreasonable due to special conditions. Such damage stability should be
demonstrated to the extent the towed object may have been previously documented
to.
13.3 Prior to sailing, the watertight and
weathertight integrity should be confirmed by an inspection of the closing
arrangements for all hatches, valves, airpipes, and other openings through
which water might enter the towed object and affect its stability. It should
also be confirmed that any watertight doors or other closing arrangements
within the hull are securely closed and that any portable closing plates are in
place.
13.4 Towed objects should be at a suitable
draught and suitably trimmed for the intended voyage, commensurate with the
stability condition demonstrated in accordance with section 13.2.
13.5 It should be documented that the towed
object has adequate structural integrity in relation to the cargo loads, the
design environmental conditions and other foreseen loads during the voyage.
Where applicable, reference should be made to the towed object's loading
manual.
13.6 The cargo securing arrangements (ref.
section 6.1) and weather protection for the cargo, equipment and stores carried
on the towed object should be carefully examined to ensure that they are
adequate for the voyage. Where applicable, reference should be made to the
towed object's cargo securing manual.
13.7 Where applicable, a bridle should normally
be used for connection of the main towing wire rope to the towed object. Chains
should be used in way of chafing areas such as fairleads.
13.8 All connection parts (e.g. each leg of a
bridle) should have a documented minimum breaking load (MBL) exceeding the
breaking load of the towing arrangement.
13.9 Towline attachments should be designed to
resist the towline pull from any likely direction, with use of fairleads if
necessary. The design and arrangement of the towing fittings should take into
account both normal and emergency conditions.
13.10 The ultimate strength of any towline attachment
(bracket or bollard and their foundation) should not be less than 1.3 times the
minimum breaking load of the towing arrangement which is to be attached.
13.11 Fairleads should be designed to accommodate the
chafing chain and should be shaped so as to prevent excessive bending stress in
the chain links.
13.12 A bridle recovery system should be fitted on the towed
object, strong enough to be utilised after towline breakage, in case the bridle
is planned to be used again during the towage.
13.13 Emergency towing equipment should be provided in case
of bridle failure or inability to recover the bridle. This equipment should
preferably be fitted at the bow of the towed object and should consist of a
spare bridle or towing pennant fitted with a floating rope and buoy allowing it
to be picked up without any significant hazard.
13.14 Towed objects should exhibit the navigation lights,
shapes and, if manned, make the sound signals required by the International
Regulations for Preventing Collisions at Sea, 1972, as amended. Due
consideration should be given to the reliability of the lights and sound
signals and their ability to function for the duration of the voyage. When
practicable, a duplicate system of lights should be provided.
13.15 Boarding facilities should be rigged on each side of
the towed object.
13.16 When appropriate, the rudder should be secured in the
amidships position and measures taken to prevent the propeller shaft from
turning.
13.17 Life-saving appliances in the form of lifejackets and
life buoys shall be provided whenever personnel are likely to be on board the
towed object even if only for short periods. When personnel are expected to
remain on board for longer periods of time, liferafts should also be provided.
If the freeboard is more than 4.5 m, liferaft davits should be provided, unless
rendered impractical due to the design or conditions of the towed object.
Whenever the towed object is continually manned, the riding-crew should
be provided with adequate supplies of food and water, cooking and sanitary
facilities, radio equipment, including means of communication with the towing
vessel, distress signals, life-saving and fire-fighting appliances.
13.18 Towed objects should be equipped with an anchor,
suitable for holding the towed object in severe weather conditions, that is
securely attached to a chain cable or wire and is arranged for release in an
emergency by persons on, or boarding the towed object, unless rendered
impractical due to the design or conditions of the towed object.