Revoked by MEPC.254(67)
RESOLUTION MEPC.214(63)
Adopted on 2 March 2012
2012 GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY EFFICIENCY DESIGN INDEX (EEDI)
THE
MARINE ENVIRONMENT PROTECTION COMMITTEE,
RECALLING Article 38(a) of the Convention on the International Maritime Organization
concerning the functions of the Marine Environment Protection Committee (the Committee)
conferred upon it by international conventions for the prevention and control of marine
pollution,
RECALLING ALSO that, at its sixty-second session, the Committee
adopted, by resolution MEPC.203(62), amendments to the
Annex of the Protocol of 1997 to amend the International Convention for the Prevention of Pollution from Ships, 1973, as modified
by the Protocol of 1978 relating thereto
(inclusion of regulations on energy efficiency for ships in MARPOL
Annex VI),
NOTING the amendments to MARPOL Annex
VI adopted at its sixty-second session by inclusion of a new chapter 4 for regulations on energy efficiency for ships, are expected to enter into force on 1 January 2013 upon
their acceptance on 1 July 2012,
NOTING ALSO that regulation 5 (Surveys) of MARPOL Annex VI, as amended, requires ships to which chapter
4 applies shall also be subject to survey and certification taking into
account guidelines developed by the Organization,
RECOGNIZING that the amendments to MARPOL Annex VI
requires the adoption of relevant guidelines for smooth and
uniform implementation of the regulations and to provide sufficient lead time
for industry to prepare,
HAVING CONSIDERED, at its sixty-third session,
the draft 2012 Guidelines on survey and certification of the Energy
Efficiency Design Index (EEDI),
1.
ADOPTS the 2012 Guidelines on survey and certification of the Energy Efficiency
Design Index (EEDI), as set out in the annex to the present resolution;
2.
INVITES Administrations to take the annexed Guidelines into account when developing and enacting national laws
which give force to and implement provisions set forth in regulation 5 of
MARPOL Annex VI, as amended;
3.
REQUESTS the Parties to MARPOL Annex VI and other Member Governments to bring
the annexed Guidelines on survey and certification of the Energy Efficiency Design Index (EEDI), to the attention of masters, seafarers, shipowners, ship operators
and any other interested groups;
4.
AGREES to keep these Guidelines under review in light of the
experience gained; and
5.
REVOKES Interim
Guidelines circulated by MEPC.1/Circ.682, as from
this date.
ANNEX
2012 GUIDELINES ON SURVEY AND CERTIFICATION OF THE ENERGY EFFICIENCY DESIGN INDEX (EEDI)
TABLE OF CONTENTS
1
GENERAL
2
DEFINITIONS
3
APPLICATION
4
PROCEDURES FOR SURVEY AND CERTIFICATION
4.1
General
4.2
Preliminary
verification of the attained EEDI at the design stage
4.3
Final verification
of the attained EEDI at sea trial
4.4
Verification of the
attained EEDI in case of major conversion
Appendix
1 Sample of EEDI
Technical File
Appendix 2
Guidelines for validation of electric power tables for EEDI (EPT-EEDI)
Appendix
3 Electric power
table form for EEDI (EPT-EEDI Form) and statement of validation
1
GENERAL
The
purpose of these
Guidelines is to assist verifiers of Energy Efficiency Design Index (EEDI) of ships in conducting the survey and certification of the EEDI in accordance with regulations 5, 6, 7, 8 and 9 of MARPOL Annex VI, and assist shipowners, shipbuilders and manufacturers being related to the energy efficiency of a
ship and other interested parties in understanding the procedures of the survey and certification of the EEDI.
2
DEFINITIONS1
_____________________
1
Other terms used in these Guidelines have the same meaning as those defined
in the EEDI Calculation
Guidelines.
2.1
Verifier means an Administration or organization duly authorized by it, which conducts the survey and certification of the EEDI in accordance with regulations 5, 6, 7, 8
and 9 of MARPOL Annex VI and these Guidelines.
2.2
Ship of the same
type means a ship of
which hull form (expressed in the lines such as sheer plan and body plan) excluding additional hull features such as fins and of which
principal particulars are identical to that of the base ship.
2.3
Tank test means
model towing tests, model self-propulsion tests and model propeller open water tests. Numerical calculations may be accepted as
equivalent to model propeller open water tests or used to complement the tank
tests conducted (e.g. to evaluate the effect
of additional hull features
such as fins, etc., on ship's performance), with approval
of the verifier.
3
APPLICATION
These Guidelines should be applied to
new ships for which an application for an initial survey or an additional
survey specified in regulation 5 of MARPOL Annex VI has been submitted to a verifier.
4
PROCEDURES FOR SURVEY AND CERTIFICATION
4.1
General
4.1.1
Attained EEDI should be calculated in accordance with regulation 20 of MARPOL Annex VI and the "Guidelines on the method of calculation of the attained
EEDI for new ships" ("EEDI Calculation Guidelines", hereafter). Survey and certification of the EEDI should be conducted on two stages:
preliminary verification at the design stage, and final
verification at the sea trial. The basic flow
of the survey and certification process is presented in figure 1.
4.1.2
The information
used in the verification process may contain confidential information of
submitters, which requires Intellectual Property Rights (IPR) protection. In
the case where the submitter want a non-disclosure agreement with the verifier, the additional information should be provided to the
verifier upon mutually agreed terms and conditions.

________________________
* To be conducted by a
test organization or a submitter itself.
Figure
1: Basic Flow of Survey and Certification Process
4.2
Preliminary
verification of the attained EEDI at the design stage
4.2.1
For the preliminary verification at the design
stage, an application for an initial survey and an EEDI Technical File containing the necessary information for the verification and other relevant background
documents should be submitted to a verifier.
4.2.2
EEDI Technical File
should be written at least in English. The EEDI Technical File should include
at least but not limited to:
.1 deadweight (DWT) or gross
tonnage (GT) for passenger and ro-ro
passenger ships, the maximum continuous rating (MCR) of the main and
auxiliary engines, the ship speed (Vref), as specified in
paragraph 2.2 of the EEDI Calculation Guidelines, type of fuel,
the specific fuel consumption
(SFC) of the main engine at the 75 per cent of MCR power, the SFC of
the auxiliary engines at the 50 per cent MCR power, and the electric power table for certain ship types, as necessary, as defined in the EEDI Calculation Guidelines;
______________________
Electric power
table should be validated separately, taking into account
guidelines set out in
appendix 2 to these Guidelines.
.2
power curve(s)
(kW knot) estimated at design stage under the condition
as specified in paragraph 2.2 of the EEDI Calculation Guidelines, and in the
event that the sea trial is carried
out in a condition other than the above
condition, then also a power curve estimated under the sea trial condition;
.3 principal particulars, ship type and the relevant information to classify the ship
into such a ship type,
classification notations and the overview
of propulsion system and electricity supply system on board;
.4 estimation process and methodology of
the power curves at design stage;
.5 description of energy saving
equipment;
.6 calculated value of the attained EEDI including the calculation summary, which should contain, at a minimum,
each value of the calculation parameters and the calculation process used to determine the attained
EEDI; and
.7 calculated values of the attained EEDIweather and fw value (not equal to 1.0), if
those values are calculated, based on
the EEDI Calculation Guidelines.
A sample of an EEDI Technical File is
provided in the appendix 1 to these Guidelines.
4.2.3
If dual fuel engines
are installed on the ship, the CF
factor and the Specific Fuel Consumption of gas fuel should be used if gas fuel will be used as the primary
fuel on the ship. In order to
verify this, the following information should be provided:
.1
The use of boil-off
gas or capacities of the gas fuel storage tanks, and the capacities of fuel oil storage tanks.
.2
Arrangements of
bunkering facilities for gas fuel in the intended operational area of the ship.
4.2.4
The SFC of
the main and auxiliary engines should be quoted from the approved NOx Technical File and should
be corrected to the value
corresponding to the ISO standard reference conditions using the standard lower calorific value of the fuel oil (42,700kJ/kg),
referring to ISO 15550:2002 and ISO 3046-1:2002. For the confirmation of the SFC, a copy of the approved
NOx Technical File and
documented summary of the correction calculations should be submitted to the
verifier. In case NOx Technical File has not been approved
at the time of the application for initial survey, the test reports provided by
manufacturers should be used. In this case, at the time of the sea trial
verification, a copy of the approved NOx Technical File and documented summary of the correction calculations should be submitted to
the verifier.
Note: SFC in the NOx Technical File are the values of a parent engine, and the use of such value of SFC for
the EEDI calculation for member engines
may have the following technical issues for further
consideration:
.1
The definition of "member engines" given in NOx Technical File is broad
and specification of engines belonging to the same group/family may
vary; and
.2
The rate of NOx emission of the parent engine is the highest
in the group/family
i.e.
CO2 emission, which is in the trade-off
relationship with NOx emission, can be
lower than the other engines in the
group/family.
4.2.5
For ships to which regulation 21 of MARPOL Annex VI applies, the power curves used for the preliminary
verification at the design stage should be based on reliable results of tank test. A tank test for an individual ship may be omitted based on technical
justifications such as availability of the results
of tank tests
for ships of the same type. In addition,
omission of tank tests is acceptable for a ship for which sea trials will be carried under the
condition as specified in paragraph 2.2 of the EEDI Calculation Guidelines,
upon agreement of the shipowner and shipbuilder and with approval of the
verifier. For ensuring the quality of tank tests, ITTC quality system should be taken into account. Model tank test should be witnessed by the verifier.
Note: It would be desirable in the future
that an organization conducting a tank test be authorized.
4.2.6
The verifier
may request the submitter for additional information on top of those
contained in Technical File, as necessary, to examine the calculation process
of the attained EEDI. The estimation of the ship speed at the design stage much depends on each
shipbuilder's experiences, and it may not be practicable for any person/organization other than the shipbuilder to fully examine
the technical aspects
of experience-based parameters such as the roughness
coefficient and wake scaling coefficient. Therefore, the preliminary verification should focus on the calculation process of the attained EEDI to ensure that it is
technically sound and reasonable and follows regulation 20 of MARPOL Annex VI and the EEDI
Calculation Guidelines.
Note 1: A possible
way forward for more robust
verification is to establish a standard
methodology of deriving the ship speed from the outcomes
of tank test, by setting
standard values for experience-based correction factors such as roughness coefficient and wake scaling coefficient. In this way, ship-by-ship performance comparison could be made more
objectively by excluding the possibility of arbitrary setting
of experience-based parameters. If such standardization is sought, this would have an implication on how the ship speed adjustment based on sea trial
results should be conducted in accordance
with paragraph 4.3.8 of these
Guidelines.
Note 2: A joint
industry standard to support the method and role of the verifier
will be developed.
4.2.7
Additional information that the verifier
may request the submitter to provide directly to it includes but not limited
to:
.1 descriptions of a tank test facility; this should include
the name of the
facility, the particulars of tanks and towing equipment, and the records
of calibration of each monitoring equipment;
.2 lines
of a model ship and an actual ship for the verification of the appropriateness of the tank test; the lines (sheer plan, body plan and half-breadth plan) should be detailed enough to demonstrate the similarity between
the model ship and the actual ship;
.3 lightweight of the ship and displacement table for the verification of the
deadweight;
.4 detailed report on the method and results of the tank test; this should
include at least the tank test results
at sea trial condition and under the condition as specified in paragraph
2.2 of the EEDI Calculation Guidelines;
.5 detailed calculation process of the ship speed, which should include
the estimation basis of experience-based parameters such as roughness coefficient, wake scaling coefficient; and
.6 reasons for exempting a tank test, if applicable; this should include
lines and tank test results of the ships of same type, and the comparison of the
principal particulars of such ships and the ship in question. Appropriate technical justification should be provided
explaining why the tank test is
unnecessary.
4.2.8
The verifier
should issue the report on the "Preliminary Verification of EEDI" after it has verified
the attained EEDI at the design stage in accordance with paragraphs 4.1 and 4.2
of these Guidelines.
4.3
Final
verification of the attained EEDI at sea trial
4.3.1
Sea trial conditions should be set as conditions specified in paragraph
2.2 of the EEDI Calculation Guidelines, if possible.
4.3.2
Prior to the sea
trial, the following documents should be submitted to the verifier: a description of the test procedure to be used for the speed trial, the final displacement table and
the measured lightweight, or a copy of the survey report of deadweight, as well as a
copy of NOx Technical File
as necessary. The test procedure should include, at a minimum, descriptions of all necessary
items to be measured and corresponding measurement methods to be used for
developing power curves under the sea trial condition.
4.3.3
The verifier should
attend the sea trial and confirm:
.1 propulsion and power supply system, particulars of the engines,
and other relevant items
described in the EEDI Technical File;
.2 draught and trim;
.3 sea
conditions;
.4 ship
speed; and
.5 shaft power and RPM of the main
engine.
4.3.4
Draught and trim should be confirmed
by the draught measurements taken prior to the sea trial. The draught
and trim should be as close as practical to those at the assumed conditions used for estimating the power
curves.
4.3.5
Sea conditions should be measured
in accordance with ISO 15016:2002 or the equivalent.
4.3.6
Ship speed should be measured in accordance with ISO 15016:2002 or the equivalent and
at more than two points of which range includes the power of the main engine as
specified in paragraph 2.5 of the EEDI Calculation Guidelines.
4.3.7
The main engine output should be measured by shaft power meter or a method which the engine manufacturer
recommends and the verifier approves. Other
methods may be acceptable upon agreement of the shipowner
and shipbuilder and with approval
of the verifier.
4.3.8
The submitter
should develop power curves based on the measured ship speed and the measured
output of the main engine at sea trial. For the development of the power curves, the submitter should calibrate
the measured ship speed, if necessary, by taking into account the effects of wind, tide,
waves, shallow water and displacement in accordance with
ISO 15016:20022 or the equivalent which may be
acceptable provided that the concept of the method is transparent for the
verifier and publicly available/accessible.
Upon agreement with the shipowner, the submitter should submit a report on the speed trials including
details of the power curve
development to the verifier for verification.
___________________
2
An
ITTC standard for this purpose will be developed.
4.3.9
The submitter
should compare the power curves obtained as a result of the sea trial and the estimated power curves at the design stage. In case differences are observed, the attained EEDI should be recalculated,
as necessary, in accordance with the following:
.1
for ships for which
sea trial is conducted under the condition as specified in paragraph 2.2 of the
EEDI Calculation Guidelines: the attained EEDI should be recalculated using the measured ship speed at sea trial at the power of the
main engine as specified in paragraph 2.5 of the EEDI Calculation Guidelines; and
.2 for
ships for which sea trial cannot be conducted under the condition
as specified in paragraph
2.2 of the EEDI Calculation Guidelines: if the measured ship speed at the power
of the main engine as specified in paragraph 2.5 of the EEDI Calculation
Guidelines at the sea trial conditions is different from the expected ship
speed on the power curve at the corresponding
condition, the shipbuilder should recalculate the attained
EEDI by adjusting ship speed
under the condition as specified in paragraph 2.2 of the EEDI Calculation Guidelines by an appropriate
correction method that is agreed by the verifier.
An example of possible methods of the
speed adjustment is given in figure 2:
Note: Further consideration
would be necessary for speed adjustment methodology in paragraph 4.3.9.2
of these Guidelines. One of the concerns relates
to a possible situation
where the power curve for sea trial condition is estimated in an excessively conservative manner (i.e. power curve is shifted in a leftward
direction) with the intention to get an upward adjustment of the ship speed by making the measured ship speed at sea trial easily exceed the lower-estimated speed for sea
trial condition at design stage.

Figure 2: An Example of Possible Ship
Speed Adjustment
4.3.10
In cases where the finally determined deadweight/gross tonnage differs
from the designed deadweight/gross tonnage used in the EEDI calculation during
the preliminary verification, the submitter should recalculate the attained EEDI using the finally determined deadweight/gross tonnage. The finally determined gross tonnage
should be confirmed in the Tonnage Certificate
of the ship.
4.3.11
In case where the
attained EEDI is calculated at the preliminary verification by using SFC based
on the manufacturer's test report due to the non-availability at that time of the approved NOx Technical File, the EEDI should be
recalculated by using SFC in the approved NOx Technical File.
4.3.12
The EEDI Technical
File should be revised, as necessary, by taking into account the results of sea trial.
Such revision should include, as applicable, the adjusted power curve
based on the results of sea trial (namely, modified
ship speed under the condition
as specified in paragraph 2.2 of the EEDI Calculation Guidelines), the
finally determined deadweight/gross tonnage and SFC described in the approved
NOx Technical File, and the recalculated attained EEDI based
on these modifications.
4.3.13
The EEDI Technical File,
if revised, should
be submitted to the verifier
for the confirmation that the
(revised) attained EEDI is calculated in accordance with regulation 20 of
MARPOL Annex VI and the EEDI Calculation Guidelines.
4.4
Verification of
the attained EEDI in case of major conversion
4.4.1
In cases where a major conversion is made to a ship, the shipowner
should submit to a verifier an
application for an Additional Survey with the EEDI Technical File duly revised
based on the conversion made and
other relevant background documents.
4.4.2
The background
documents should include at least but are not limited to:
.1 documents explaining details of the conversion;
.2 EEDI parameters changed after the
conversion and the technical justifications
for each respective parameter;
.3 reasons for other changes made in the
EEDI Technical File, if any; and
.4 calculated value of the attained EEDI with the calculation summary,
which should contain, at a minimum,
each value of the calculation parameters and the calculation process
used to determine the attained
EEDI after the conversion.
4.4.3
The verifier
should review the revised EEDI Technical File and other documents
submitted and verify the calculation process of the attained EEDI to ensure
that it is technically sound and reasonable and follows regulation 20 of MARPOL Annex VI and the EEDI
Calculation Guidelines.
4.4.4
For verification of the attained
EEDI after a conversion, speed trials of the ship are
required, as necessary.
APPENDIX 1
SAMPLE OF EEDI TECHNICAL FILE
1
Data
1.1
General information
|
Shipbuilder |
JAPAN Shipbuilding Company |
|
Hull No. |
12345 |
|
IMO
No. |
94111XX |
|
Kind
of ship |
Bulk carrier |
1.2
Principal particulars
|
Length overall |
250.0 m |
|
Length between perpendiculars |
240.0 m |
|
Breadth, moulded |
40.0 m |
|
Depth, moulded |
20.0 m |
|
Summer load
line draught, moulded |
14.0 m |
|
Deadweight at
summer load line draught |
150,000 tons |
1.3
Main engine
|
Manufacturer |
JAPAN Heavy
Industries Ltd. |
|
Type |
6J70A |
|
Maximum continuous rating (MCR) |
15,000
kW x 80 rpm |
|
SFC
at 75% MCR |
165.0 g/kWh |
|
Number
of set |
1 |